SIERRA ODC Private Limited SIERRA ODC Private Limited
info@sierratec.com

  • SIERRA
  • Services
  • Products
    • eFACiLiTY® – Enterprise Facility Management System
    • WMCentral – Warehouse Management System
  • Skills
  • Partners
  • Clients
    • Clients & End Users
    • SUCCESS STORIES
    • Key Projects
    • Client Speak
  • Careers
  • News
  • Achievements
  • Contact us

eFACiLiTY® for Haramain High Speed Rail Project, Kingdom of Saudi Arabia

eFACiLiTY® for Haramain High Speed Rail Project, Kingdom of Saudi Arabia
By admin
April 1, 2016

Client Overview:

Haramain High Speed Rail Project, a 449.2 kilometers (279.1 mi) high speed inter-city Rail transport system, is under construction for the Kingdom of Saudi Arabia. The project is expected to link the Muslim holy cities of Medina and Mecca via King Abdullah Economic City, Rabigh, Jeddah, and King Abdulaziz International Airport. The railway system will connect a number of centers, boosting local businesses and tourism.

Client Requirement

  • Automation of Preventive & Corrective Maintenance of all assets in the Rail Network

  • Work order generation, Tracking and SLA management

  • Contracts Management

  • Inventory Management of Spare Parts, Consumables, Tools etc.

  • Integration with Honeywell EBI the Building Automation System (BAS/BMS) for instant, remote and automatic generation of work orders based on BMS Alarms

SIERRA Solution

L&T Electrical & Automation FZE (LTEAFZE) an open architecture ‘Systems Integrator’ company based in U.A.E was to implement a sophisticated, yet simple to use and effective solution for Haramain’s requirement. L&T FZE selected SIERRA’s eFACiLiTY since eFACiLiTY is tightly integrated with Honeywell EBI and has already been implemented for similar projects including Mumbai Metro, KL Sentral etc.

eFACiLITY’s maintenance management and drawing management modules proposed extensively covers the below functions needed for the project:

  • Asset Management and Tracking

  • Work Order Management

  • Corrective & Preventive Maintenance

  • Service Level Agreement Management

  • Procurement Management

  • Contract Management

  • Scheduling of Technical Labor

  • Inventory Management

  • Job Requests Management

  • Tracking of all Drawings / Documents

Once implemented, any electro-mechanical failures across the rail-network will be detected by the Building Automation System and instantly the breakdown maintenance work orders will be generated and assigned to the technicians who will receive SMS/Email alerts enabling them to attend to the problems quickly. In case the technical doesn’t acknowledge/respond, the Service Level Agreement (SLA) management kicks-in to raise multi-level escalations ensuring that the maintenance issues are fixed quickly for smooth functioning of the Railway Network

Categories: Case Studies
Tags: eFACiLiTY
Share This Article
Facebook Twitter Pinterest Linkedin
Prev Post
Next Post

Related Articles

Warehouse Automation with AS/RS integration for Reserve Bank of India subsidiary BRBNMPL Currency Printing Press
By admin
June 9, 2020

Warehouse Automation with AS/RS integration for Reserve Bank of India subsidiary BRBNMPL Currency Printing Press

READ MORE
Automating the Storage and Retrieval (AS/RS) operations of Wockhardt’s Green Field Warehouse
By admin
April 23, 2020

Automating the Storage and Retrieval (AS/RS) operations of Wockhardt’s Green Field Warehouse

READ MORE

Add your Comment

Recent Posts

  • Ferried on a 2-seater Cessna 208B Grand Caravan EX aircraft for our eFACiLiTY® Software Implementation at Lake Turkana
  • Unlock Peak AS/RS Performance with WMCentral – Please Visit Us at CII Expo 2025 (Stall L15)
  • Discover Next-Generation Facility Management: Meet eFACiLiTY® at LEAP 2025
  • A Transformational Milestone for SIERRA!
  • Wishing You a Merry Christmas and a Prosperous New Year 2025 from SIERRA & eFACiLiTY®!

Categories

  • 2005 (1)
  • 2006 (2)
  • 2009 (3)
  • 2010 (8)
  • 2011 (4)
  • 2012 (2)
  • 2013 (2)
  • 2014 (7)
  • 2015 (7)
  • 2016 (9)
  • 2017 (5)
  • 2018 (1)
  • 2019 (8)
  • 2020 (3)
  • 2021 (6)
  • 2022 (4)
  • 2023 (9)
  • 2024 (5)
  • 2025 (4)
  • Achievements (15)
  • Business (8)
  • Case Studies (19)
  • Corporate (4)
  • Creative (5)
  • News (90)
  • Startup (3)
  • Technology (2)

Newsletter

Quick Menu

  • Home
  • SIERRA
  • Services
  • Products
  • Contact Form

Like us on Facebook

Recent Post

Ferried on a 2-seater Cessna 208B Grand Caravan EX aircraft for our eFACiLiTY® Software Implementation at Lake Turkana

Ferried on a 2-seater Cessna 208B Grand Caravan EX aircraft for our eFACiLiTY® Software Implementation at Lake Turkana

Unlock Peak AS/RS Performance with WMCentral – Please Visit Us at CII Expo 2025 (Stall L15)

Unlock Peak AS/RS Performance with WMCentral – Please Visit Us at CII Expo 2025 (Stall L15)

© 2021 SIERRA ODC Private Limited

  • News
  • Careers
  • Management Policies
  • Contact Us